Irving School: Addition / Mechanical Upgrades
As part of a district-wide upgrade plan, Bozeman Schools identified replacement of a 50 year old mechanical system, upgrades to meet ADA standards, and response to changing educational requirements as a high priority at the historic Irving School. That design challenge was met through the careful teamwork of the School District, Comma-Q Architecture, Mechanical Engineer Larry Bronec, and Structural Engineer John Schlegelmilch.
The team created 2,000 square feet of new mechanical space without changing the building footprint and, in the process, incorporated a new full size classroom, support space, office, elevator corridor for future elevator addition, and additional accessible toilet rooms.

Comma-Q/MSU Events
- May 23, 2012MSU - CoB - Schematic Design Review 1
- May 24, 2012 10:00 amMSU - CoB - Sustainability Charrette
- June 18, 2012MSU - CoB - SD Review 2
- July 18, 2012MSU - CoB - SD Review 3
Types of Projects
- Churches (2)
- Commercial (14)
- Considerations (15)
- Historic Preservation (14)
- Renovation (2)
- Education (14)
- Edu: University (2)
- Edu: K-12 (12)
- Institutional (9)
- Pre-Design (4)
- Assessment (2)
- Planning (1)
- Programming (1)
- Residential (19)
- Condominium (2)
- Multi-Family (2)
- Single-Family (17)